Windsor Chevron Remodel

Windsor Chevron is requesting Site Plan and Design Review and a Use Permit for a major remodel of the existing gas station located at 9120/9200 Old Redwood Highway, Windsor. The project would include demolition of the existing convenience store and carwash, and construction of a new 5,475-square foot convenience store/restaurant; automated carwash with 85-foot-long tunnel and three self-serve vacuum stations; two additional fuel pumps with canopy extension; replacement and upgrade of the bulk-propane dispenser; and a comprehensive sign program. 

Public Hearing: Planning Commission, September 14, 2021

Windsor Chevron Remodel

Notice of Intent to Adopt a Mitigated Negative Declaration

The 30-day review period is August 5, 2021 to September 6, 2021. Please email comments to kvoge@townofwindsor.com by September 6, 2021.